Our Work

At Balochs Consulting Corp., we are proud of our diverse portfolio of successful projects, showcasing our expertise and commitment to excellence. Here are some highlights of the projects led by Aadrish Baloch.

Water Services Metro Vancouver

Metro Vancouver uses a system of watersheds, dams, treatment facilities, reservoirs, pump stations, and water mains. Upgrades are constantly being made to the water system to maintain the quality and reliability of high-quality drinking water to the region.

Trans Mountain Expansion

It will be approximately 980 km of new pipeline, It will include 193 km of reactivated pipeline, 12 new pump stations will be built, 19 new tanks will be added to the existing storage terminals in Burnaby (14), Sumas (1) and Edmonton (4), Three new berths will be built at Westridge Marine Terminal in Burnaby.

Suncor Integrity Solutions

Optimization at the Suncor Base Plant. Base Plant operation is home to two mines and extraction operations, integrated upgrading facilities known as Upgrader 1 and Upgrader 2, and the associated infrastructure for these assets – including utilities, energy, reclamation and storage facilities and the interconnecting pipelines between our Oil Sands Base operations and Syncrude.

Peace Pipeline

Peace Pipeline is a multiphase oil and natural gas liquids (NGL) pipeline in Alberta and British Columbia, Canada.

Sunrise Cutbank Ridge

The project is part of the Cutbank Ridge Partnership Program to develop natural gas and natural gas liquid (NGL) production, with three similar projects: Sunrise 04-26, Tower 03-07 and Saturn 15-27 Phase 2.

Sturgeon Refinery

The NWR Sturgeon Refinery is the world’s first bitumen refinery designed from the ground up with carbon capture and storage to produce the high-value fuel products needed to meet North America’s demand for energy.

Westcoast Connector Gas Transmission

The proposed project was to build an approximately 850 kilometre natural gas pipeline corridor from the Cypress area in northeast B.C. to Ridley Island, near Prince Rupert. Project: Pipeline capable of transporting up to 4.2 billion cubic feet (Bcf) per day of natural gas.

Fort Hills Oil Sands

Fort Hills began producing paraffinic froth-treated bitumen from secondary extraction in early 2018 and has a nameplate capacity of 194,000 barrels per day (gross) of bitumen.

Kearl Oil Sands

Kearl is one of Canada’s largest open-pit mining operations as well as considered one of Canada’s highest-quality oil sands deposits and is being developed with technology innovations that reduce cost and enhance environmental performance.